top of page
1/15
​
-
The delivery drivers only level the buildings.
NO GROUND WORK! -
The treated wood foundation skids are rated for DIRECT contact with the soil.
-
If the customer prefers a gravel or concrete pad, a moisture barrier or some other ground work they must have it done prior to delivery
-
-
We recommend that buildings are supported every 8’ on all of the foundation skids
-
If the building’s site is less than 6 inches out of level, concrete blocks are not required and the delivery drivers will use treated wood blocks to level up your building​
-
If the building’s site is MORE than 6 inches out of level,
-
we do require the customer have concrete blocks on site
SETUP & DELIVERY